ELEGOO Neptune 4 MAX (Plus) Y Axis Upgrade Linear Rail Installation Guide Animation Version

Аватар автора
Технологические новации завтра
TBStron3D provides you with the simplest upgrade solution and the most comprehensive installation guide. Upgrade operation steps. 1.Remove the platform board and unscrew the nuts by hand, then store them for later use. 2.Remove the screws holding the central fixed heated bed and take the heated bed plate down. Store the springs and pillars for later use. 3.Remove the screws securing the synchronous belt fixing plate, and store the screws for later use. 4.Remove the Y-axis rear panel and set it aside. 5.Carefully unplug the Y-axis accelerometer. 6.Take out the Y-axis slider board from the extrusion. 7. Remove the 6 POM wheels from the slider board. 8. Attach M4*8 screws and M4 T-nuts to the long beam separately . (For ease of viewing, the components in the Z-axis direction have been hidden. It is not necessary to disassemble the Z-axis during actual installation.) 9.Secure the Y-axis rear baffle to the profile. 10. Secure the long beam onto the profile (it is recommended to install the left side first). In the front and back directions, the distance of the long beam from the rear of the machine is 25mm for MAX and 23mm for Plus. Alternatively, use the notches on the top of the long beam and the position of the machine screws as a reference for positioning. In the vertical direction, the bottom of the long beam should be flush with the machine shell, aligning the top with the profile of the machine . 11.Use M3*6 screws to fasten the linear guide to the long beam. 12.

0/0


0/0

0/0

0/0