Baker Hughes NovaLT™12 Gas Turbine – upgrade existing unit

Аватар автора
Зеленый стиль
The NovaLT™12 is designed for up to 35K hours mean time between maintenance (MTBM), and targeting 24-hours engine swap. It is easy to be installed and it is an ideal solution to replace existing units or aged equipment. #gasturbine

0/0


0/0

0/0

0/0